Project · Port Angeles
A big, level patio on sloping ground in Port Angeles
The homeowners wanted a large, level patio off the porch steps, with steps down to the garage so the whole property connects. The ground had other ideas, so we planned around it.
- Town
- Port Angeles
- Project
- Patio, tiered walls and steps
- Size
- About 1,000 sq ft
- Timeline
- 4 to 5 weeks
Before and after




What they wanted
A large, level patio right off the porch steps, about 1,000 square feet, plus steps down to the garage on the back side so everything ties together.
The grade problem
Between the porch steps and the far end of the patio the ground drops a long way, and there were a lot of grades to meet. On one side we built a stepped, tiered retaining wall that follows the grade and holds a level surface on top.



Walls, boulders and steps
The walls are a mix of boulders and traditional concrete wall block. Cast stone and natural stone steps tie them together and lead from the garage area up to the main patio.

Water, septic and downspouts
Drains run all through the base under the patio. They collect the water that comes off the driveway and let it out on the low side of the wall. We worked around the septic system, and tied in and moved the gutter downspouts.
Four to five weeks of careful work
This was a 4 to 5 week project, with many loads of material in and out and a lot of details to get right. The homeowners were great to work with, and we went the extra mile to give them a space they can use however they like.
Big construction tears up the lawn around it. To finish, we brought in clean screened topsoil, leveled and graded it smooth, and reseeded the lawn so the whole yard came back fresh.
After






Why the plan matters
On a project like this, hire someone with a real plan who knows what they're doing. There are a lot of ways for a job this size to go wrong without one.